In the past (2010), the Unica Foundation realized a water supply with 210 tapping points in Tangting. Due to an additional water requirement and a reduced capacity of the original source, expansion of this system with an extra reservoir is necessary.
The following elements are being realized within this project:
- Management of the land for the construction of the project
- Construction of the infrastructure for the drinking water projects (reception room, pipeline)
- Local contribution from the local community
- Coordination with local stakeholders for project effectiveness
This adaptation / extension is made possible by the Unica Foundation in collaboration with the Nepalese Red Cross and with support from Rexcom.
Information
Beneficiaries:
200 households with about 1,200 people
Location:
Tangting, Madi Rural Municipality, ward no-2, Kaski
Start date: End date:
01-03-2020 30-06-2020
Status:
Completed
Techniques
Drinking water systems
Partners & sponsors
Nepal Red Cross Society (NRCS) Kaski
Madi Rural Municipality
Water User’s Committee, Tangting
Rexcom